9 |
20 min |
Sunday 5 |
Session 7 |
17:30 - 18:30 |
Methodologies and Technologies |
Gemini I |
ECONOMIC DESIGN OF MEWMA VSSI CONTROL CHARTS FOR MULTIATTRIBUTE PROCESSES |
10 |
20 min |
Sunday 5 |
Session 7 |
17:30 - 18:30 |
Applications |
Gemini II |
ENGINE CALIBRATION PROCESS OPTIMIZATION |
12 |
20 min |
Sunday 5 |
Session 7 |
17:30 - 18:30 |
Methodologies and Technologies |
Gemini I |
AGGREGATION OF STAKEHOLDER PREFERENCES IN SUSTAINABLE FOREST MANAGEMENT USING AHP |
15 |
30 min |
Saturday 4 |
Session 1 |
10:30 - 12:30 |
Applications |
Gemini II |
AN EXACT ALGORITHM FOR THE CLOSE ENOUGH TRAVELING SALESMAN PROBLEM WITH ARC COVERING CONSTRAINTS |
16 |
20 min |
Sunday 5 |
Session 5 |
11:00 - 12:30 |
Applications |
Gemini II |
INTERVAL AVAILABILITY ANALYSIS OF A TWO-ECHELON, MULTI-ITEM SYSTEM |
21 |
20 min |
Sunday 5 |
Session 7 |
17:30 - 18:30 |
Methodologies and Technologies |
Gemini I |
PRICE SKIMMING STRATEGY FOR NEW PRODUCT DEVELOPMENT |
27 |
30 min |
Sunday 5 |
Session 6 |
14:45 - 16:00 |
Applications |
Gemini II |
COPING WITH LONG TERM MODEL RISK IN MARKET RISK MODELS |
28 |
30 min |
Saturday 4 |
Session 1 |
10:30 - 12:30 |
Methodologies and Technologies |
Gemini I |
SYMMETRY BREAKING CONSTRAINTS FOR THE PROBLEM OF PACKING EQUAL CIRCLES IN A SQUARE |
29 |
20 min |
Sunday 5 |
Session 6 |
14:45 - 16:00 |
Applications |
Gemini II |
DEVELOPMENT OF SEQUENTIAL ASSOCIATION RULES FOR PREVENTING MINOR-STOPPAGES IN SEMI-CONDUCTOR MANUFACTURING |
31 |
30 min |
Sunday 5 |
Session 5a |
11:00 - 12:30 |
Applications |
Gemini III |
HYBRID COLUMN GENERATION-BASED APPROACH FOR VRP WITH SIMULTANEOUS DISTRIBUTION, COLLECTION, PICKUP-AND-DELIVERY AND REAL-WORLD SIDE CONSTRAINTS |
39 |
Poster |
Saturday 4 |
Poster Session 1 |
16:00 - 16:30 |
Methodologies and Technologies |
Foyer |
APPROXIMATE SOLUTIONS FOR SOME ADVANCED MULTISERVER RETRIAL QUEUES |
40 |
20 min |
Monday 6 |
Session 8a |
09:45 - 10:45 |
Methodologies and Technologies |
Gemini III |
SALES PIPELINE PREDICTION - Predicting a Pipeline using Time Series and Dummy Variable Regression Models |
41 |
20 min |
Sunday 5 |
Session 4 |
09:45 - 10:45 |
Applications |
Gemini II |
BEAM ANGLE OPTIMIZATION IN IMRT USING PATTERN SEARCH METHODS: INITIAL MESH-SIZE CONSIDERATIONS |
42 |
20 min |
Saturday 4 |
Session 1a |
10:30 - 12:30 |
Applications |
Gemini III |
MULTILEVEL UNIT COMMITMENT IN SMART GRIDS |
43 |
20 min |
Monday 6 |
Session 8 |
09:45 - 10:45 |
Methodologies and Technologies |
Gemini I |
A TWO-PLAYER MODEL FOR THE SIMULTANEOUS LOCATION OF FRANCHISING SERVICES WITH PREFERENTIAL RIGHTS |
44 |
30 min |
Saturday 4 |
Session 3 |
16:30 - 17:30 |
Methodologies and Technologies |
Gemini I |
BUSINESS PROCESS ENTERPRISE MODEL - Operations Research for Managing Business Process Communication and Performance |
45 |
20 min |
Sunday 5 |
Session 7 |
17:30 - 18:30 |
Applications |
Gemini II |
SHOULD A COMPANY INVEST IN TRAINING - Costs/Benefits of PMP Certification on a Construction Project |
46 |
20 min |
Monday 6 |
Session 8 |
09:45 - 10:45 |
Methodologies and Technologies |
Gemini I |
BI-LEVEL CLUSTERING IN TELECOMMUNICATION FRAUD |
47 |
20 min |
Sunday 5 |
Session 5 |
11:00 - 12:30 |
Applications |
Gemini II |
TRANSMISSION EXPANSION PLANNING WITH RE-DESIGN - A Greedy Randomized Adaptive Search Procedure |
48 |
30 min |
Saturday 4 |
Session 1 |
10:30 - 12:30 |
Applications |
Gemini II |
STOCHASTIC SHORTEST PATH PROBLEM WITH UNCERTAIN DELAYS |
49 |
Poster |
Saturday 4 |
Poster Session 1 |
16:00 - 16:30 |
Methodologies and Technologies |
Foyer |
MAXIMUM LIKELIHOOD ESTIMATION OF MULTIVARIATE SKEW T-DISTRIBUTION |
50 |
30 min |
Sunday 5 |
Session 6 |
14:45 - 16:00 |
Methodologies and Technologies |
Gemini I |
A STRATEGIC SIMULATION TOOL FOR CAPABILITY-BASED JOINT FORCE STRUCTURE ANALYSIS |
54 |
Poster |
Saturday 4 |
Poster Session 1 |
16:00 - 16:30 |
Methodologies and Technologies |
Foyer |
INTEGRATED PRODUCTION AND MAINTENANCE PLANNING - Modeling Corrective Maintenance |
57 |
30 min |
Sunday 5 |
Session 5 |
11:00 - 12:30 |
Methodologies and Technologies |
Gemini I |
IMPACT OF BLOCKING WHEN CUSTOMERS OF DIFFERENT CLASSES ARE ACCOMMODATED IN ONE COMMON QUEUE |
61 |
Poster |
Saturday 4 |
Poster Session 1 |
16:00 - 16:30 |
Methodologies and Technologies |
Foyer |
ECONOMIC-PROBABILISTIC MODEL FOR RISK ANALYSIS IN PROJECTS |
66 |
30 min |
Saturday 4 |
Session 1 |
10:30 - 12:30 |
Applications |
Gemini II |
THE PRIZE-COLLECTING VEHICLE ROUTING PROBLEM WITH NON-LINEAR COST - Integration of Subcontractors into Route Design of Small Package Shippers |
67 |
Poster |
Sunday 5 |
Poster Session 2 |
16:00 - 16:30 |
Methodologies and Technologies |
Foyer |
A TEXT CLASSIFICATION METHOD BASED ON LATENT TOPICS |
68 |
Poster |
Sunday 5 |
Poster Session 2 |
16:00 - 16:30 |
Applications |
Foyer |
OPTIMIZING OPERATIONS OF LARGE WATER SUPPLY NETWORKS - A Case Study |
69 |
20 min |
Saturday 4 |
Session 1a |
10:30 - 12:30 |
Applications |
Gemini III |
SEMIDEFINITE RELAXATIONS FOR THE SCHEDULING NUCLEAR OUTAGES PROBLEM |
72 |
30 min |
Sunday 5 |
Session 7a |
17:30 - 18:30 |
Applications |
Gemini III |
A COOPERATIVE MODEL FOR MULTI-CLASS PEER-TO-PEER STREAMING NETWORKS |
73 |
30 min |
Saturday 4 |
Session 2 |
14:45 - 16:00 |
Applications |
Gemini II |
EFFICIENT WASTE COLLECTION BY MEANS OF ASSIGNMENT PROBLEMS |
80 |
30 min |
Saturday 4 |
Session 1 |
10:30 - 12:30 |
Methodologies and Technologies |
Gemini I |
COMPUTING VALID INEQUALITIES FOR GENERAL INTEGER PROGRAMS USING AN EXTENSION OF MAXIMAL DUAL FEASIBLE FUNCTIONS TO NEGATIVE ARGUMENTS |
81 |
20 min |
Sunday 5 |
Session 4 |
09:45 - 10:45 |
Applications |
Gemini II |
A MULTI-CRITERIA SORTING APPROACH FOR DIAGNOSING MENTAL DISABILITIES |
83 |
30 min |
Sunday 5 |
Session 5 |
11:00 - 12:30 |
Applications |
Gemini II |
INVENTORY ALLOCATION FOR ONLINE GRAPHICAL DISPLAY ADVERTISING USING MULTI-OBJECTIVE OPTIMIZATION |
85 |
20 min |
Sunday 5 |
Session 4 |
09:45 - 10:45 |
Applications |
Gemini II |
EMODS: A NOVEL EVOLUTIONARY METAHEURISTIC BASED IN THE AUTOMATA THEORY FOR THE MULTIOBJECTIVE OPTIMIZATION OF COMBINATORIALS PROBLEMS |
88 |
30 min |
Saturday 4 |
Session 1 |
10:30 - 12:30 |
Applications |
Gemini II |
GENERALIZED DISAGGREGATION ALGORITHM FOR THE VEHICLE ROUTING PROBLEM WITH TIME WINDOWS AND MULTIPLE ROUTES |
89 |
30 min |
Saturday 4 |
Session 3 |
16:30 - 17:30 |
Methodologies and Technologies |
Gemini I |
APPLYING CASE-BASED REASONING FOR IDENTIFYING THE NEGOTIATION PROFILE OF ELECTRONIC NEGOTIATION SYSTEM USERS |
95 |
20 min |
Saturday 4 |
Session 1a |
10:30 - 12:30 |
Applications |
Gemini III |
A PARALLEL HEURISTIC FOR FAST TRAIN DISPATCHING DURING RAILWAY TRAFFIC DISTURBANCES: EARLY RESULTS |
96 |
30 min |
Sunday 5 |
Session 5 |
11:00 - 12:30 |
Methodologies and Technologies |
Gemini I |
SYNAPTIC TRANSMISSION AND FOKKER-PLANCK EQUATION |
98 |
20 min |
Sunday 5 |
Session 5a |
11:00 - 12:30 |
Applications |
Gemini III |
PLANNING BUS DRIVER ROSTERS |
99 |
20 min |
Monday 6 |
Session 8a |
09:45 - 10:45 |
Methodologies and Technologies |
Gemini III |
SOLVING THE 3D CONTAINER SHIP LOADING PLANNING PROBLEM BY REPRESENTATION BY RULES AND BEAM SEARCH |
100 |
20 min |
Sunday 5 |
Session 4 |
09:45 - 10:45 |
Methodologies and Technologies |
Gemini I |
STUDY ON QUEUING BEHAVIOR IN A MULTICHANNEL SERVICE FACILITY USING EXPERIMENTAL METHODS |
101 |
Poster |
Saturday 4 |
Poster Session 1 |
16:00 - 16:30 |
Applications |
Foyer |
A HIERARCHICAL APPROACH BASED ON LINEAR AND STOCHASTIC PROGRAMMING FOR THE EMPTY CONTAINER ALLOCATION PROBLEM |
104 |
20 min |
Saturday 4 |
Session 2 |
14:45 - 16:00 |
Applications |
Gemini II |
TOURISM-KM - A Variant of MMKP Applied to the Tourism Domain |
105 |
20 min |
Sunday 5 |
Session 5a |
11:00 - 12:30 |
Applications |
Gemini III |
MULTICRITERIA SELECTION OF AN AIRCRAFT WITH NAIADE |
106 |
20 min |
Monday 6 |
Session 8 |
09:45 - 10:45 |
Applications |
Gemini II |
FLOW-BASED PROGRAMMING AS A SOLUTION FOR CLOUD COMPUTING REQUIREMENTS |
108 |
20 min |
Monday 6 |
Session 8 |
09:45 - 10:45 |
Methodologies and Technologies |
Gemini I |
TERMINATION OF SIMULATED ANNEALING ALGORITHM SOLVING SEMI-SUPERVISED LINEAR SVMS PROBLEMS |
109 |
20 min |
Saturday 4 |
Session 2 |
14:45 - 16:00 |
Methodologies and Technologies |
Gemini I |
SOLVING THE RCPSP WITH AN EVOLUTIONARY ALGORITHM BASED ON INSTANCE INFORMATION |
110 |
30 min |
Sunday 5 |
Session 6 |
14:45 - 16:00 |
Methodologies and Technologies |
Gemini I |
BRKGA ADAPTED TO MULTIOBJECTIVE UNIT COMMITMENT - Solving Pareto Frontier for UC Multiobjective Problem using BRKGA SPEA2 NPGA and NSGA II Techniques |
111 |
20 min |
Sunday 5 |
Session 4 |
09:45 - 10:45 |
Methodologies and Technologies |
Gemini I |
A COLUMN GENERATION APPROACH FOR THE BI-OBJECTIVE MAX-MIN KNAPSACK PROBLEM |
112 |
20 min |
Sunday 5 |
Session 6 |
14:45 - 16:00 |
Methodologies and Technologies |
Gemini I |
DEVELOPMENT OF AN OPTIMIZATION MODEL FOR IMAGE COLLECTION PLANNING |
113 |
Poster |
Sunday 5 |
Poster Session 2 |
16:00 - 16:30 |
Methodologies and Technologies |
Foyer |
A SERVICE-ORIENTED APPROACH TO EFFICIENT DECISION SUPPORT |
115 |
20 min |
Monday 6 |
Session 8 |
09:45 - 10:45 |
Applications |
Gemini II |
WIRELESS MESH NETWORKS PLANNING BASED ON PARAMETERS OF QUALITY OF SERVICE |
118 |
Poster |
Sunday 5 |
Poster Session 2 |
16:00 - 16:30 |
Methodologies and Technologies |
Foyer |
OPTIMIZATION TOOLS ADRESSING FUZZY UNCERTAINTY AT POWER FLOWS |
119 |
20 min |
Sunday 5 |
Session 7 |
17:30 - 18:30 |
Methodologies and Technologies |
Gemini I |
EVALUATING VEHICLE ROUTING PROBLEMS WITH SUSTAINABILITY COSTS |
120 |
20 min |
Sunday 5 |
Session 5 |
11:00 - 12:30 |
Applications |
Gemini II |
DYNAMIC RESPONSE ANALYSIS OF MULTIBODY SYSTEM IN DISCRETE EVENT SIMULATION |
125 |
20 min |
Sunday 5 |
Session 4 |
09:45 - 10:45 |
Methodologies and Technologies |
Gemini I |
STRATEGIES TO MODEL SCHEDULING DECISIONS TO PLAN THE SOFT DRINK PRODUCTION PROCESS |
126 |
20 min |
Saturday 4 |
Session 1a |
10:30 - 12:30 |
Applications |
Gemini III |
A GENETIC ALGORITHM FOR CROP ROTATION |
129 |
Poster |
Saturday 4 |
Poster Session 1 |
16:00 - 16:30 |
Applications |
Foyer |
EXPERIENTIAL STATE AND EFFECT OF FACTORS ON THE DIMENSIONS OF OFFER IN A SERVICE COMPANY - Using Confirmatory Factor Analysis: A Five Factor Model |
132 |
30 min |
Saturday 4 |
Session 1 |
10:30 - 12:30 |
Methodologies and Technologies |
Gemini I |
CONTINUOUS-TIME REVENUE MANAGEMENT IN CARPARKS |
135 |
30 min |
Saturday 4 |
Session 1a |
10:30 - 12:30 |
Applications |
Gemini III |
A MULTI-CRITERIA APPROACH TO LOCAL ENERGY PLANNING - The Case of Barreiro Municipality |
136 |
30 min |
Sunday 5 |
Session 6 |
14:45 - 16:00 |
Applications |
Gemini II |
COMBINATIONS OF OPTION SPREADS |
137 |
20 min |
Sunday 5 |
Session 7a |
17:30 - 18:30 |
Applications |
Gemini III |
GENETIC ALGORITHM FOR SOLVING A MULTI-OBJECTIVE HELICOPTER ROUTING PROBLEM |
139 |
Poster |
Sunday 5 |
Poster Session 2 |
16:00 - 16:30 |
Applications |
Foyer |
MARGINING COMPONENT OF THE STOCK MARKET CRASH OF OCTOBER 2008 - A Lesson of the Struggle with Combinatorial Complexity |
140 |
Poster |
Sunday 5 |
Poster Session 2 |
16:00 - 16:30 |
Methodologies and Technologies |
Foyer |
THE ANALYTICAL HIERARCHY PROCESS (AHP) APPROACH TO MODELLING CORPORATE CLIMATE CHANGE RESPONSE |
141 |
20 min |
Saturday 4 |
Session 2 |
14:45 - 16:00 |
Methodologies and Technologies |
Gemini I |
ENTERPRISE NETWORK REDESIGN THROUGH SERVER CONSOLIDATION |
144 |
Poster |
Saturday 4 |
Poster Session 1 |
16:00 - 16:30 |
Applications |
Foyer |
INTRODUCTION TO MULTICRITERIA TECHNIQUES |
147 |
20 min |
Saturday 4 |
Session 2 |
14:45 - 16:00 |
Applications |
Gemini II |
A KNAPSACK PROBLEM APPROACH FOR OPTIMAL ALLOCATION OF MAINTENANCE RESOURCES ON ELECTRIC POWER DISTRIBUTION NETWORKS |
152 |
30 min |
Saturday 4 |
Session 2 |
14:45 - 16:00 |
Methodologies and Technologies |
Gemini I |
A FORWARD-BACKWARD ALGORITHM FOR STOCHASTIC CONTROL PROBLEMS - Using the Stochastic Maximum Principle as an Alternative to Dynamic Programming |